Flow Grout C50 is a ready-mixed, compensated-shrinkage, powdered mortar made from high strength cement, selected aggregates, special super-plasticising additives and synthetic fibers. When mixed with water, Flow Grout C50 forms hi-flow mortar suitable for pouring into formwork, when used to reintegrate concrete, or into specially prepared seats, when used for anchoring work, without having to vibrate the mix and with no risk of segregation, including when applied in thick layers. If Flow Grout C50 is mixed with water only, it must be cured in a damp environment in order to allow its expansive properties to develop fully and correctly. Thanks to this particular technology, guaranteeing higher dimensional stability and a reduction in cracking phenomenon. Flow Grout C50 complies with the principles defined in EN 1504-9, the requirements of EN 1504-3, which regulates products used to carry out structural and non-structural repairs on concrete elements, and of EN 1504-6, which defines products used to anchor rebar in place.
Product Description
Field of Application
• Structural reintegration of reinforced concrete pillars and beams by pouring the mortar into formwork.
• Repairing the lower spigots on pre-compressed viaduct beams.
• Reintegrating floor slabs after removing damaged areas by scarifying.
• Repairing concrete floors.
• Filling rigid joints between concrete elements.
• Anchoring metal structures.
• Footings for masonry.
• Anchoring machine tools by casting the mortar below and the machine base.
• Repairing concrete steps.
Product Details
Product identity
Class according to EN 1504-3: R4
Type: PCC
Consistency: powder
Color: grey
Maximum diameter of aggregate (EN 1015-1) (mm): 2.5
Bulk density (kg/m³): 1,400
Dry solids content (%): 100
Ion chloride content (%): ≤ 0.05
PACKAGING
Flow Grout C50 is supplied in:
– 25 kg paper bags
COVERAGE / CONSUMPTION
The consumption is approximately 1.5kg/m2 at 1 mm thickness.
Application Procedure
Preparation of the substrate
• Remove all deteriorated and loose concrete to form a solid, rough and strong substrate. Any areas previously repaired and which are not perfectly bonded must also be removed.
• Remove all dust, rust, cement laitance, grease, oil and paint from the concrete and reinforcement rods by sandblasting or hydro-sandblasting.
• Treat reinforcement rods with Ferroprimer 1K or 2K, according to the procedure given in the Technical Data Sheet of product.
• Saturate the substrate with water.
• Before carrying out repairs, wait until excess water has evaporated.
Preparing the product
Pour approximately 5.5 liters of clean water into a container and slowly add a 25 kg bag of Flow Grout C50 while mixing. Carefully mix the blend for several minutes then remove any powder which has stuck to the sides and bottom of the container. Add more water to obtain the consistency required without exceeding the recommended amount, approximately 6-6.5 liters. Mix again for several minutes to form a well-blended, plastic consistency, lump-free mixture. Flow Grout C50 remains workable for around 15 minutes at +10°C to +25°C.
Applying the product
Pour a constant flow of Flow Grout C50 into the formwork from one side only, making sure that the air is expelled and make sure the formwork is well sealed to prevent any mortar leaking out. The formwork must not draw any of the mixing water from the Flow Grout C50 and it is recommended to treat the formwork with a form-release product. There is no need to vibrate the mortar after pouring. Pieces of round bar may be used to help the mortar flow into more difficult areas. If areas thicker than 5 cm need to be repaired with Flow Grout C50 and they are not confined, dolly bars must be placed in position before pouring the mortar so that the layer of mortar over them is at least 2-3 cm thick. Layers less than 5 cm thick may be poured without adding rebar, as long as the substrate has a surface roughness of at least 5 mm to contrast expansion phenomenon, which normally takes place within the first 24 hours. When applied as anchoring of metallic structures pour Flow Grout C50 in a constant flow from one side only, making sure that the air is expelled from the area to be filled, which must be at least 2.5-3 times bigger than the diameter of the bar to be anchored. The mortar does not need to be vibrated after pouring. Use lengths of round iron bar to work the mortar into tight spaces.